Brownfield Cleanup and Development

REMEDIATION OF FORMER POWER PLANT
(2006)

The need for comprehensive remediation services was apparent when this former power plant first contracted with Brookside. The complete scope of work included the proper removal of hazardous underground storage tanks and steel foundation piles, as well as the excavation and disposal of contaminated soil and debris. Brookside provided an outstandinglabor force to ensure dependable and timely service during this sizeable, two-phase project.

Services Provided:

  • Excavated, cleaned and properly removed nine underground
      storage tanks containing gas, oil, and waste oil
  • Removed and disposed of over 300 concrete-filled, steel
      foundation piles ranging in size from
     12"- 16" diameter, 8-20' deep
  • Excavated, transported and disposed of over 10,000 tons
      of contaminated soil
  • Backfilled and disposed of creosote piles, concrete,
      and demolition debris